Meridian Drilling & Geotechnics was incorporated and licensed in 2016 by Corporate Affairs Commission with BN No.2446303 to carry out a wide range of projects, services and general contracts.
We specialize in water borehole drilling projects and geoscience services amongst others. At Meridian Drilling & Geotechnics, we integrate cutting-edge geotechnical and hydrogeological techniques with sustainable practices. Our commitment to eco-friendly methods, efficient water management, and environmentally conscious designs ensures minimal environmental impact in all our projects.
Meridian Drilling & Geotechnics renders a wide variety of services in hydrogeological and geotechnical engineering such as geophysical surveys, shallow and industrial water borehole drillings, water treatment plant installations and maintenance, soil investigations and recommendations as well as pile foundation designs and constructions.
PROJECT | CLIENT/CONSULTANT | REMARKS |
---|---|---|
Drilling of 4 Nos. Water Boreholes with stanchion stand at Awolowo Road, Ikorodu, Lagos | LKJ Nigeria Limited | Completed 2018 |
10 Nos. Drilling and completion Solar powered Water Borehole in Ogun and Oyo State | Ogun Oshun River Basin, Abeokuta, Ogun State | Completed 2018 |
2 Nos. Solar Powered Water Borehole with stanchion stand and reticulation | Offa Grammar School, Alumni 78 set | Completed 2018 |
1No. Water Borehole Drilling with reticulation and Stanchion Stand at Anglican Church Idi | Satkay Group Limited | Completed 2019 |
24 Nos. Solar Powered water Borehole Projects in Osun, Lagos, Katsina, Gombe, Kano, Kwara,Oyo, Edo and Ogun state. | Telepro Consulting Services Limited/MTN Foundation | Completed 2023 |
MTN Ibafo Water Treatment Plant Revamp at MTN Ibafo Depot | Telepro Consulting Limited/MTN | Completed 2023 |
1No. Solar powered water borehole project with stanchion stand at Our LadyApostle Secondary School, Yaba, Lagos | Telepro Consulting Services Limited/MTN Foundation | Completed 2024 |
Design, construction and installation of water treatment plant at Havenof Peace, Marwa, Lekki, Lagos | Lola Bolarinwa & Co. | Completed 2018 |
Water Treatment Plant maintenance at MTN Plaza, Awolowo Road, Ikoyi | Telepro Consulting Services Limited | Completed 2023 |
Design, construction and installation of water treatment plant at House of Grace, U3 estate,Lekki, Lagos | Lola Bolarinwa & Co. | Completed 2018 |
Drilling and completion of 2 Nos. Industrial Water Borehole at Magodo Phase 2, Lagos | High Dee Engineering Limited | Completed 2018 |
1No. Water borehole drilling at First Quiver School. Ajao | First Quiver School. Ajao | Completed 2019 |
Sub-soil Investigation for a proposed a Storey building at Sapata Village Extension , Ikota ,Lagos | IMAK ConsultingLimited | Completed 2022 |
Sub-soil Investigation for a proposed hotel Storey building at Ikorodu | IMAK ConsultingLimited | Completed 2022 |
Sub-soil Investigation for a proposed development Building at Ebutte Ikorodu, Lagos | IMAK ConsultingLimited | Completed 2022 |
Installation 78 Nos Piles of 300mm at 9m depth, Bola Shadipe Street, Surulere, Lagos | Sulbath Nigeria Limited | Completed 2022 |
Installation 35 Nos Piles of 400mm at 21m depth, Ifako Gbagada , Lagos | Sulbath Nigeria Limited | Completed 2023 |
Geotechnical soil Investigation for a proposed building at Aje street, Yaba, Lagos | Imak Consulting Limited | Completed 2023 |
Design, construction and installation of water treatment plant at Isabella Court , Hakeem Dickson , Lekki, Lagos | Prolific Shoppers Lekki County | Completed 2021 |
Design, construction and installation of water treatment plant at PIER Place, Montgomery, Yaba, Lagos | Wessex Estate Limited | Completed 2023 |
Geotechnical Soil Investigation for a prposedhotel at no 3b Amore Street off Toyin Street, Ikeja | Samco City Works Limited | Completed 2024 |
Installation 44 Nos Piles of 450mm at 15m depth, Gaba estate, Lakowe | Prince Akintola | Completed 2023 |
Installation 105 Nos Piles of 450mm at 9m depth, estate, Lekki Scheme 2 estate, Lagos | Ark Consulting Services Limited | Completed 2023 |
Name | Designation | Experience | Qualifications |
---|---|---|---|
Keji Adefemi | Managing Director | 15 Years | B.sc Geology, M.sc Engineering Geology, MBA Marketing, CNMGS, CCOMEG |
Aderibigbe Segun | Project Manager | 10 Years | B.sc Geology, M.sc Engineering Geology |
BabaMusa Rasheed | Project Engineer | 15 Years | HND Civil Engineering |
AbdulRahaman Oseni | Project Engineer | 12 Years | HND Civil Engineering |
Sheriff Gbolohan | Resident Surveyor | 4 Years | B.Sc Surveying and Geomatics |
Keji Lukman | Project Engineer | 12 Years | B.Eng. COREN |
Ajayi Babatunde | Head Driller | 10 Years | - |
Shittu Azeez | Head Geotech Driller | 15 Years | - |
Joe Lawrence | Head Driller 2 | 12 Years | - |
Moshood Abass | Driller | 18 Years | - |
Our team are well trained and experienced in both basement and sedimentary drilling water projects.
Our commitment to using the best equipments available, guarantees reliable and superior results in all our geotechnical and hydrogeological services.
Clear and continuous communication is vital for the success of our projects and the satisfaction of our clients. We ensure open lines of communication at all times to keep you informed and involved.
Ensuring the well-being of our team and delivering top-quality services to our clients are fundamental to our operations and success.
Working Hours
Monday - Saturday: 8:00 - 18:00 Sunday: Closed